Incineration Bottom Ash Treatment / Dalian / 500 tons/day

Liaoning MSW Incineration Plant Bottom Ash Comprehensive Utilization Project

The Liaoning MSW incineration plant bottom ash comprehensive utilization project was commissioned in 2024, with a designed capacity of 500 t/d, processing bottom ash generated by MSW incineration power plants.

Industry: Incineration Bottom Ash TreatmentLocation: DalianCapacity: 500 tons/day

Case Overview

The Liaoning MSW incineration plant bottom ash comprehensive utilization project was commissioned in 2024, with a designed capacity of 500 t/d, processing bottom ash generated by MSW incineration power plants.

Project Parameters

ParameterDetails
Application ScenarioIncineration Bottom Ash Treatment
Project LocationDalian
Processing Capacity500 tons/day

Project Background and Treatment Objectives

The Liaoning MSW Incineration Plant Bottom Ash Comprehensive Utilization Project belongs to the incineration bottom ash treatment scenario, located in Dalian, with a processing capacity of 500 t/d.

The Liaoning MSW incineration plant bottom ash comprehensive utilization project was commissioned in 2024, with a designed capacity of 500 t/d, processing bottom ash generated by MSW incineration power plants.

Liaoning MSW Incineration Plant Bottom Ash Comprehensive Utilization Project On-site 1

Process Route and System Configuration

Centered around project treatment objectives, the solution focuses on process organization, core equipment coordination, and material sorting pathways, forming a stable treatment and resource recovery flow.

The Liaoning MSW incineration plant bottom ash comprehensive utilization project was commissioned in 2024, with a designed capacity of 500 t/d, processing bottom ash generated by MSW incineration power plants.

Liaoning MSW Incineration Plant Bottom Ash Comprehensive Utilization Project On-site 2

Sorted Output and Resource Recovery Value

The project’s value is reflected in material resource recovery, final output, environmental compliance, and operational efficiency.

The Liaoning MSW incineration plant bottom ash comprehensive utilization project was commissioned in 2024, with a designed capacity of 500 t/d, processing bottom ash generated by MSW incineration power plants.

Liaoning MSW Incineration Plant Bottom Ash Comprehensive Utilization Project On-site 3