Solid Recovered Fuel / Zhejiang / 100 tons/day

Aituo Environmental Industrial Solid Waste Disposal Project

The project primarily processes mixed general industrial waste and combustibles screened from renovation waste, with a capacity of 100 t/d. This system adopts the process route of 'coarse shredding + ferromagnetic metal sorting + fine shredding.'

Industry: Solid Recovered FuelLocation: ZhejiangCapacity: 100 tons/day

Case Overview

The project primarily processes mixed general industrial waste and combustibles screened from renovation waste, with a capacity of 100 t/d. This system adopts the process route of “coarse shredding + ferromagnetic metal sorting + fine shredding.” The system mainly consists of a coarse shredder, electromagnetic self-unloading iron remover, and fine shredder. Material size after secondary shredding: 85% by weight <=150mm, with some flexible materials exceeding 150mm.

Project Parameters

ParameterDetails
Application ScenarioSolid Recovered Fuel
Project LocationZhejiang
Processing Capacity100 tons/day

Project Background and Treatment Objectives

The Aituo Environmental Industrial Solid Waste Disposal Project belongs to the solid recovered fuel scenario, located in Zhejiang, with a processing capacity of 100 t/d.

The project primarily processes mixed general industrial waste and combustibles screened from renovation waste, with a capacity of 100 t/d. This system adopts the process route of “coarse shredding + ferromagnetic metal sorting + fine shredding.” The system mainly consists of a coarse shredder, electromagnetic self-unloading iron remover, and fine shredder.

Material size after secondary shredding: 85% by weight <=150mm, with some flexible materials exceeding 150mm.

Aituo Environmental Industrial Solid Waste Disposal Project On-site 1

Process Route and System Configuration

Centered around project treatment objectives, the solution focuses on process organization, core equipment coordination, and material sorting pathways, forming a stable treatment and resource recovery flow.

The project primarily processes mixed general industrial waste and combustibles screened from renovation waste, with a capacity of 100 t/d.

This system adopts the process route of “coarse shredding + ferromagnetic metal sorting + fine shredding.” The system mainly consists of a coarse shredder, electromagnetic self-unloading iron remover, and fine shredder.

Material size after secondary shredding: 85% by weight <=150mm, with some flexible materials exceeding 150mm.

Aituo Environmental Industrial Solid Waste Disposal Project On-site 2

Sorted Output and Resource Recovery Value

The project’s value is reflected in material resource recovery, final output, environmental compliance, and operational efficiency.

The project primarily processes mixed general industrial waste and combustibles screened from renovation waste, with a capacity of 100 t/d.

This system adopts the process route of “coarse shredding + ferromagnetic metal sorting + fine shredding.” The system mainly consists of a coarse shredder, electromagnetic self-unloading iron remover, and fine shredder.

Material size after secondary shredding: 85% by weight <=150mm, with some flexible materials exceeding 150mm.